The short answer
- Scope 1 emissions come from sources a company owns or controls. Scope 2 come from the energy it buys. Scope 3 are all other emissions in its value chain, upstream and downstream.
- The GHG Protocol's Scope 3 Standard, released in 2011, sorts value-chain emissions into 15 categories, including purchased goods and services and upstream and downstream transport.
- The EU Carbon Border Adjustment Mechanism (CBAM) puts a price on the emissions embedded in imports of iron and steel, aluminium, cement, fertilisers, hydrogen and electricity. Its definitive regime began on 1 January 2026.
- Scope 3 is a reporting measure. CBAM is a payment: importers above a 50-tonne threshold buy and surrender certificates matching the embedded emissions.
What are scope 1, 2 and 3 emissions?
The three scopes come from the Greenhouse Gas (GHG) Protocol, a widely used accounting standard for company emissions. They split a company's footprint by how directly it causes each tonne.
- Scope 1: direct emissions from sources the company owns or controls, such as fuel burned in its boilers, furnaces and own vehicles.
- Scope 2: indirect emissions from electricity, steam, heat or cooling the company buys. They happen at the power plant but count for the buyer.
- Scope 3: every other emission the company's activity causes outside its own walls, from the materials it buys to the use and disposal of what it sells.
For many companies, scope 3 is the majority of the footprint. For supply chain teams, the categories that matter most are usually 1 (purchased goods and services), 4 (upstream transportation and distribution) and 9 (downstream transportation and distribution). Freight bought from carriers lands in scope 3, while a company's own truck fleet sits in scope 1.
| Scope 3 category | Supply chain example |
|---|---|
| 1 Purchased goods and services | Steel, resin, components, packaging, outsourced services |
| 4 Upstream transport and distribution | Inbound freight and storage of purchased goods |
| 9 Downstream transport and distribution | Delivery and storage of sold products on the way to customers |
| 12 End-of-life of sold products | Disposal or recycling of products after use |
A selection of the 15 categories. The GHG Protocol and US EPA guidance list them all.
What is CBAM and how does it work?
The Carbon Border Adjustment Mechanism is an EU rule that asks importers of certain carbon-heavy goods to pay for the emissions released while making them. The aim is that imported steel or cement carries a carbon cost similar to what EU producers pay under the EU Emissions Trading System (ETS).
It covers iron and steel, aluminium, cement, fertilisers, hydrogen and electricity, plus selected precursors and products made from them. A transitional period from 2023 to 2025 required reports only. Since 1 January 2026, in the definitive regime, importers bringing in more than a single 50-tonne mass threshold of CBAM goods in a year must hold authorised CBAM declarant status and pay through certificates.
The certificate price follows EU ETS allowance auction prices. For 2026 imports the Commission publishes a quarterly price; it set €75.36 for the first quarter, €75.28 for the second and €82.32 for the third. From February 2027 certificates are bought on a common central platform, with prices published weekly. The first annual declaration, for 2026 imports, is due by 30 September 2027. The detail of the threshold and its knock-on effects are told in the CBAM 50-tonne line.
Scope 3 vs CBAM: how they connect
The two use the same raw fact, the carbon released making a product, for different purposes. For a European buyer of imported steel, the producer's emissions are part of the buyer's scope 3, category 1. Under CBAM, the same emissions, declared as embedded emissions, become a cost paid at import.
| Scope 3 | CBAM | |
|---|---|---|
| What it is | An accounting and reporting measure | An EU charge on certain imports |
| Goods | Everything bought, moved, sold and disposed of | Steel, aluminium, cement, fertilisers, hydrogen, electricity and listed products |
| Money | None directly | Certificates priced from EU ETS auctions |
| Data source | Supplier data, averages, spend-based estimates | Verified producer values or Commission defaults |
The practical link is data. A supplier that can give verified, plant-specific emissions improves the buyer's scope 3 inventory and, for CBAM goods, can lower the certificate bill compared with cautious default values. Carbon prices already paid in the country of production can also be deducted when proven.
A worked example
Invented numbers. A Dutch machine builder imports 400 tonnes of steel brackets in 2026, well above the 50-tonne threshold. Its supplier provides verified data showing 1.9 tonnes of CO2 per tonne of product. Embedded emissions are 400 × 1.9 = 760 tonnes.
At an invented average certificate price of 80 euros, the gross cost is 760 × 80 = 60,800 euros, before any deduction for carbon price paid abroad or other adjustments under the rules. If the supplier had sent no verified data, the default value for that product would apply instead, and the bill would follow that value. The same 760 tonnes also appear in the company's scope 3, category 1 report.
Common Scope 3 and CBAM mistakes
Questions to ask before you act
- Which scope 3 categories carry most of the footprint, and how is each estimated?
- Which imports fall under CBAM goods, and how many tonnes a year do they add up to?
- Which suppliers can provide verified, plant-specific emissions data?
- Is the CBAM certificate cost built into landed cost and product pricing for 2026 imports?
Frequently asked questions
What is the difference between scope 1, 2 and 3 emissions?
Scope 1 is from sources a company owns or controls, scope 2 is from the energy it buys, and scope 3 is every other emission in its value chain, from purchased goods to the use and disposal of products sold.
How many scope 3 categories are there?
The GHG Protocol's Scope 3 Standard defines 15 categories, covering both upstream activities such as purchased goods and transport, and downstream ones such as product use and end-of-life.
What goods does CBAM cover?
Iron and steel, aluminium, cement, fertilisers, hydrogen and electricity, plus selected precursors and products made from them.
When does CBAM start to cost money?
The definitive regime began on 1 January 2026. Certificates for 2026 imports are surrendered with the first annual declaration, due by 30 September 2027.
Is freight scope 1 or scope 3?
Freight bought from carriers is scope 3, usually category 4 or 9. Fuel burned in a company's own trucks is scope 1.
Read next
Sources
- GHG Protocol: Corporate Value Chain (Scope 3) Standard
- US EPA: Scope 1 and Scope 2 inventory guidance
- US EPA: Scope 3 inventory guidance
- European Commission: Carbon Border Adjustment Mechanism
- European Commission: CBAM definitive regime
- European Commission: Price of CBAM certificates
- European Commission: CBAM communication and FAQs
Sources opened and checked Nov 2026.
The list sees it first
One Logbook entry a week, one wave at a time. Nothing you upload is ever kept.
Thanks. You are on the list.