The short answer
- The Carbon Border Adjustment Mechanism (CBAM) puts a carbon price on certain goods imported into the EU: iron and steel, aluminium, cement, fertilisers, hydrogen and electricity, plus some products made from them.
- Since 1 January 2026, an importer bringing in more than 50 tonnes a year of these goods (electricity and hydrogen apart) needs authorised CBAM declarant status.
- For 2026 imports, the declarant buys certificates from February 2027 and files the first annual declaration by 30 September 2027.
- Without verified emissions data from the producing plant, default values apply, and they are set to be cautious, which usually means a higher bill.
The subsidiary in the EU had never thought of itself as a steel importer. It bought brackets, fasteners and aluminium profiles from three suppliers abroad and turned them into machine frames. Each order was small. Nobody added up the weight.
In May, a customs broker in the port of entry asked for a CBAM account number before filing the next declaration. The tonnage for the year had crossed fifty in the second week of April. Nobody had applied for authorisation before the end of March, so there was no pending application to lean on. Two pallets waited. A purchasing assistant began writing to suppliers about emissions data in a language they had never been asked about.
The goods were ordinary. The paperwork was new.
What is the CBAM 50-tonne threshold?
The threshold is a single figure: the combined net mass of iron and steel, aluminium, fertiliser and cement goods one importer brings into the EU in a calendar year. Below 50 tonnes, the importer is outside CBAM's obligations. Above it, every tonne counts, not only the tonnes over the line.
| Year | What happens | Who does it |
|---|---|---|
| 2023–2025 | Transitional phase: quarterly reports, no payment | Importers or their representatives |
| 2026 | Definitive phase begins. Imports above 50 tonnes need declarant status | The authorised declarant |
| Feb 2027 | Certificates go on sale, priced on 2026 quarterly averages of the EU carbon price | Bought from the national authority on a common platform |
| 30 Sep 2027 | First annual declaration and surrender of certificates for 2026 imports | The authorised declarant |
Where a carbon price was already paid where the goods were made, the corresponding amount can be deducted.
Importers that applied for authorisation by 31 March 2026 could keep importing while their application was pending. An importer that crosses the line without authorisation faces a penalty calculated on the emissions embedded in those goods; penalties are set and enforced by each member state.
Where it goes wrong
CBAM pulls on three parts of a company at once, and none of them owns the whole.
The signs already in your files
A single in-scope code is a question. The gap is real when two records point the same way:
- Your item master holds tariff codes in CBAM chapters for goods shipped into the EU.
- Your EU import entries for those goods carry no authorised declarant reference.
- Your supplier records for the same goods hold no plant name, no installation data and no emissions figures.
- Your ledger shows no cost line or accrual for carbon certificates on those imports.
What it costs, told honestly
Invented numbers for one EU subsidiary's 2026 imports. Each pool stands against its own total:
| Pool | Total | Of which | Share |
|---|---|---|---|
| In-scope EU entries | 96 entries | entries filed before declarant status was granted | 14 of 96 |
| In-scope suppliers | 11 suppliers | suppliers with no verified plant emissions data | 8 of 11 |
| Duty and border charges on in-scope imports | 38,500 | 21,700 estimated certificate cost, not accrued | 56% |
| Value of in-scope goods imported | 1,410,000 | 21,700 carbon cost missing from landed value | 1.5% |
The certificate line is an estimate until the emissions and the price are known. Read against duty it looks large; read against the goods it looks small. Both are true, which is why the pools are never added.
How the world answers
There is no published penalty case yet under the full regime. The closest documented record is the Commission's own, and it shows how the rule was narrowed and how its price is now running.
European Union A pilot, then a narrower net · 2023–2026
CBAM's transitional phase ran from October 2023 to the end of 2025 as a reporting pilot, with no payment. Default values were allowed in those reports only until July 2024. In October 2025 the EU adopted a simplification that replaced the old approach with one 50-tonne yearly threshold per importer.
The law required the threshold to leave out less than 1% of embedded emissions. In September 2026 the Commission's own assessment found it exempted 0.87% for April 2025 to March 2026.
Last effect: a proposal to extend CBAM to downstream goods made from steel and aluminium and to add anti-circumvention rules is still listed as a proposal, so the scope may widen again.
European Union The price clock starts · 2026–2027
For 2026, the certificate price is the quarterly average of the EU carbon allowance auctions. The Commission published €75.36 for the first quarter, €75.28 for the second and €82.32 for the third. A correcting act for the default values followed in mid-2026, with an updated default values file and new guidance for producers outside the EU published in August.
Last effect: certificates go on sale from February 2027; the first declarations and surrenders for 2026 imports are due by 30 September 2027, and from 2027 prices will be published weekly.
Questions to ask before you act
- What was the combined tonnage of in-scope goods imported into the EU this year, counted across every entity that acts as importer?
- Who is the importer or indirect customs representative for those goods, and does it hold declarant status or a pending application?
- Which suppliers can provide verified emissions data for the plant that made the goods, and by when?
- Is a carbon cost accrued on 2026 imports, and is it in the standard cost of those items?
- Has any carbon price already been paid in the country of production that could be deducted?
Frequently asked questions
What is the CBAM 50-tonne threshold?
From 2026, importers bringing in no more than 50 tonnes a year of in-scope iron and steel, aluminium, fertiliser and cement goods are exempt from CBAM obligations. Electricity and hydrogen are not covered by the threshold.
Who needs to be an authorised CBAM declarant?
An EU importer, or its indirect customs representative, that imports more than 50 tonnes of CBAM goods in a calendar year.
When are CBAM certificates bought for 2026 imports?
From February 2027, with the first annual declaration and surrender due by 30 September 2027.
What happens if suppliers do not provide emissions data?
Default values apply. They are set cautiously, so the certificate bill is usually higher than with verified actual data.
Read next
Sources
- European Commission: Carbon Border Adjustment Mechanism
- European Commission: CBAM definitive regime
- European Commission: price of CBAM certificates
- European Commission: CBAM communication and news
- European Commission: CBAM FAQs and factsheets
- European Commission: CBAM legislation and guidance
- European Commission: CBAM archive (transitional phase)
- EUR-Lex: Regulation (EU) 2025/2083
Sources opened and checked Nov 2026.
The list sees it first
One essay a week, one wave at a time. Nothing you upload is ever kept.
Thanks. You are on the list.