Your data stays yours
Chart RoomPlanning & inventory

Reorder point: the number that tells you to order before you need to

A reorder point turns a lead time into a trigger. Here is the formula, what stock it should be compared with, and why the trigger fires late more often than early.

OpEx 3Ws7 min readUpdated 19 Nov 2026Facts checked Nov 2026

The short answer

  • The reorder point (ROP) is the stock level at which a new replenishment order is placed, so that the goods arrive before the shelf runs out.
  • The basic formula is reorder point = average daily demand × lead time in days + safety stock.
  • The first part covers expected demand during the lead time; the safety stock covers the days when demand or lead time is worse than expected.
  • The trigger should compare against inventory position (on hand plus on order, minus what is already promised), not just what is on the shelf.
  • A reorder point is only as good as its inputs: a stale lead time or a wrong stock record makes the order go out late.

What is a reorder point?

A reorder point, also called a reorder level, is a line drawn on an item's stock. When the stock falls to that line, someone (or the system) raises a purchase or production order. The line is placed high enough that the stock left at that moment will last until the new goods are received and ready to use.

This is called continuous review: stock is watched all the time and an order goes out the moment the line is crossed, often for a fixed quantity. The alternative is periodic review, where stock is checked on a calendar (every Monday, every month) and topped up to a target level. Many ERP systems also offer a min/max rule, a close relative: the reorder point is the min, and the order fills back up towards the max instead of using a fixed quantity.

How a reorder point firesSales draw stockeach sale or issue lowers theinventory positionLine crossedposition falls to the reorderpointOrder raisedPO or work order goes out,ideally the same dayLead time runsstock keeps falling whilegoods travelGoods availablereceived, checked and put awaybefore zero
The trigger and the wait. The reorder point exists because stock keeps falling after the order is placed.

The reorder point formula

Written plainly: Reorder point = average daily demand × lead time in days + safety stock. If there is no variation at all, the safety stock term is zero and the reorder point is simply the demand expected during the lead time.

Two details matter more than the arithmetic. First, the lead time is the whole wait, from the moment the need is seen to the moment the goods can be picked: order processing, the supplier's production, transport, receiving and put-away. See the types of lead time. Second, the number compared with the reorder point should be the inventory position:

Inventory position =Why it is counted
Stock on handwhat is physically in the warehouse
+ open orders not yet receivedotherwise the system re-orders goods already on the way
− stock reserved for customer orders or backordersit is on the shelf but no longer free

Comparing only on-hand stock with the reorder point is a common cause of duplicate orders.

A worked example

Invented numbers. A spare-parts warehouse issues a pump seal at 25 units a day. Its measured lead time, from raising the order to the seal being on the pick face, is 12 days. Safety stock has been set at 90 units.

Reorder point = 25 × 12 + 90 = 390 units. On the day the inventory position touches 390, an order goes out. Over the next 12 days about 300 seals are used, so the delivery should land with about 90 left: the safety stock, untouched. If the supplier slips by three days, those 90 units carry the warehouse through.

One cycle of a pump sealInvented example · 25 a day, reorder point 390, safety stock 90lead time: ~300 usedsafety stock in useempty024681012141618daysposition hits 390PO sent a day lateplanned arrivalzero if still late90 units of safety stock buy about 3.6 days at 25 a day; a day lost raising the PO comes out of them.
What the buffer buys. Every day lost between the trigger and the order is a day taken from the safety stock.

Reorder point vs safety stock vs order quantity

Three numbers work together and are easy to mix up. The reorder point answers when to order. The order quantity answers how much, often set with the economic order quantity or a supplier's minimum. The safety stock is the part of the reorder point that is not expected to be used.

Changing one moves the others. A bigger order quantity means fewer orders, so the reorder point is crossed less often, but it does not lower the reorder point itself. A longer or less reliable lead time raises both the demand part and the safety stock part.

Common reorder point mistakes

Watching the shelf onlyIf open orders are not counted, every review sees stock below the line and orders again. The duplicates arrive together, weeks later, as excess.
Stock that is not thereWhen the record overstates the shelf, the line is crossed in the system after it was crossed in reality, and the order leaves late. See phantom inventory.
Lead time stops at the dockGoods waiting at receiving cannot be picked. Leaving receiving and put-away out of the lead time shrinks the cover, as in dock-to-stock time.

Questions to ask before you act

  1. Is the trigger compared with inventory position, or only with stock on hand?
  2. Does the lead time run to the moment the goods can be picked, not just to the dock?
  3. How often is the stock record checked against the shelf for this item?
  4. When demand is seasonal, does the reorder point move with the season?

Frequently asked questions

What is the reorder point formula?

Reorder point = average daily demand × lead time in days + safety stock. It covers the demand expected while the order is on its way, plus a buffer for surprises.

What is the difference between reorder point and safety stock?

The reorder point is the whole trigger level. Safety stock is only the reserve inside it that should still be there when the delivery arrives.

Is reorder point the same as minimum stock?

In many ERP min/max settings the minimum works as the reorder point. Some firms use "minimum stock" to mean safety stock, so it is worth checking which one a system means.

Should the reorder point use stock on hand?

It works best with inventory position: on hand plus open orders, minus stock already reserved. Otherwise orders already on the way are ordered again.

How often should a reorder point be updated?

Whenever demand, lead time or its variation changes noticeably. Fast-moving items are usually reviewed more often than slow ones.