Your data stays yours
Chart Room›Air, parcel & road›Carrier liability limits
Chart RoomAir, parcel & road

Carrier liability limits: why the carrier pays by the kilo, not by the invoice

When a carrier loses or damages cargo, the law usually caps what it owes. Here are the caps for road, air and sea, the clocks beside them, and how the gap gets covered.

OpEx 3Ws8 min readUpdated 19 Nov 2026Facts checked Nov 2026

The short answer

  • A carrier liability limit caps what a road, air or sea carrier pays for lost or damaged cargo, even when the carrier is at fault. The cap is set per kilo of gross weight, or per package.
  • Road (CMR): 8.33 SDR per kilo. Air (Montreal Convention): 26 SDR per kilo since 28 December 2024. Sea (Hague-Visby Rules): 666.67 SDR per package or 2 SDR per kilo, whichever is higher.
  • An SDR (Special Drawing Right) is a unit of account of the International Monetary Fund. ICAO put 26 SDR at about US$35.
  • A declared value written on the transport document before shipment, or cargo insurance, is how the gap between the cap and the invoice gets covered.
  • Every regime also runs a clock: written notice within days of delivery, and a lawsuit within one year (road, sea) or two years (air).

What is a carrier liability limit?

A carrier liability limit is the most a carrier has to pay when goods in its care are lost, damaged or, in some regimes, delayed. International conventions set it for each mode, and they govern most cross-border moves by road, air and sea.

The bargain is old. The carrier accepts a duty to look after the goods; in return its payout is a fixed amount per kilo or per package, not the invoice value. For heavy, cheap cargo the cap often covers the loss. For light, valuable cargo such as instruments or medicines, it covers a sliver.

The limits are written in SDR (Special Drawing Rights), whose value against every currency moves daily. A court converts the amount into local money on a date the convention names, such as the date of judgment.

The limits by mode: CMR, Montreal and Hague-Visby

Mode and ruleLimitTime to sueHow to go above the cap
Road, CMR8.33 SDR per kg of gross weight lost or damaged1 year (3 years for wilful misconduct)A declared value, or a declared special interest in delivery, against an agreed surcharge
Air, Montreal Convention26 SDR per kg from 28 Dec 2024. The original text said 17; ICAO reviews it every five years for inflation2 years from arrivalA special declaration of interest at handover, with any extra charge paid
Sea, Hague-Visby Rules666.67 SDR per package or unit, or 2 SDR per kg, whichever is higher1 year from deliveryNature and value declared before shipment and written into the bill of lading
Sea, US COGSAUS$500 per package1 year from deliveryNature and value declared before shipment

Forwarders, couriers and 3PLs often set their own limits in their trading conditions, alongside the convention.

Two details move the number. Under Hague-Visby, when a container's bill of lading lists the packages inside, say 40 cartons, each carton counts as a package. When it lists only the container, the box itself may count as one.

The conventions also drop the cap for the worst conduct: CMR for wilful misconduct, Hague-Visby for damage caused intentionally or recklessly. The Montreal clause that lifts limits names the passenger and baggage paragraphs, not the cargo one, which makes the air cap the hardest to break.

The claim clocks: notice and time bars

A cap only matters if the claim survives. Each regime starts two clocks at delivery: written notice of loss or damage within days, and a time bar, the last day to sue. A late notice makes a road or sea claim harder to prove, and under the Montreal Convention it bars the claim outright; a missed time bar ends it. Claims filed after the deadline fail even when the carrier was plainly at fault.

Notice clocks after deliverydays from delivery to the consigneeact at oncewindows closingnotice late0510152025daysVisible damage: on receiptSea: hidden damageRoad: hidden damageAir: damage noticeAir and road: delayRoad counts 7 days without Sundays and public holidays. Suits: 1 year road and sea, 2 years air.
Days, not months. The notice windows close within three weeks of delivery, long before most survey reports arrive.

A worked example: one crate, four answers

For road and air: cap = limit per kg × gross weight. For sea under Hague-Visby: cap = the higher of 666.67 SDR × packages and 2 SDR × gross kg. A quick exposure test: value per kilo = invoice value ÷ gross weight.

Invented numbers. A sensor maker ships one crate, 200 kg gross, invoiced at 60,000 dollars: 300 dollars a kilo. Assume 1 SDR = 1.35 dollars. Air: 26 × 200 = 5,200 SDR, about 7,020 dollars. Road: 8.33 × 200 = 1,666 SDR, about 2,249 dollars. Sea, one crate on the bill of lading: 666.67 SDR beats 2 × 200 = 400 SDR, so about 900 dollars. Sea, the same goods as 10 listed cartons: 6,667 SDR, about 9,000 dollars.

How much of 60,000 the cap paysOne 200 kg shipment of sensors, inventedAir, Montreal12%5,200 SDR, about 7,020 of 60,000Road, CMR4%1,666 SDR, about 2,249 of 60,000Sea, 1 crate2%666.67 SDR, about 900 of 60,000Sea, 10 cartons15%6,667 SDR, about 9,000 of 60,000Assumes 1 SDR = 1.35 dollars. The rest is uncovered unless declared or insured.
Packing changes the payout. The same goods earn ten times more cover at sea when the bill of lading lists ten cartons instead of one crate.

The invoice proves what the goods were worth; it does not raise the cap.

Carrier liability vs cargo insurance

Carrier liability is a claim against someone else. The cargo owner proves the loss happened in the carrier's care, the carrier can use its convention's defences, and the payout stops at the cap.

Cargo insurance is a policy the cargo owner, or the seller under terms such as CIF, buys. It pays the insured value agreed in the policy, usually without first settling fault, and the insurer then pursues the carrier for what the cap allows. A declared value sits between the two: a higher limit for a higher freight charge.

Common mistakes with liability limits

Claiming the invoiceA claim for the full invoice meets a cap set at booking. The gap was decided before the goods moved, as told in claims capped by the limit.
One container, one packageA bill of lading that shows only the container, not the cartons inside, can shrink a sea claim to a single package limit.
Waiting for the surveyHolding the notice until the surveyor reports can miss a 3, 7 or 14 day window. A short written notice can go first, as late cargo claims show.

Questions to ask before you act

  1. What is the value per kilo of this shipment, and how does it compare with the cap for the mode we booked?
  2. Does the bill of lading list the packages inside the container, or only the container?
  3. Who holds cargo insurance for this leg, and on what insured value?
  4. Who in the receiving team sends written notice of damage, and within how many days?

Frequently asked questions

What is the CMR liability limit?

Under the CMR convention for international road carriage, compensation for loss or damage is capped at 8.33 SDR per kilo of gross weight short. A higher declared value or a declared special interest in delivery, agreed with the carrier, can raise it.

What is the Montreal Convention limit for cargo?

26 SDR per kilogram since 28 December 2024, about US$35 a kilo according to ICAO. It was 22 SDR before that, and ICAO reviews it every five years.

What is the Hague-Visby package limitation?

666.67 SDR per package or unit, or 2 SDR per kilo of gross weight, whichever is higher, unless a higher value was declared and written into the bill of lading.

How long do I have to file a cargo claim?

Written notice is due within days: 3 days for hidden sea damage, 7 for road, 14 for air, and 21 days for delay by air or road. Lawsuits must be brought within 1 year for sea and road and 2 years for air.

Read next

Sources

Sources opened and checked Nov 2026.

The list sees it first

One Logbook entry a week, one wave at a time. Nothing you upload is ever kept.