Cargo claim filed after the deadline: the damage was real, the date was wrong

A carrier can be at fault and still owe nothing, because the notice went late or the claim missed the time bar. The clocks by mode, the signs in your files, and what courts did.

OpEx 3Ws9 min readUpdated 19 Nov 2026Facts checked Nov 2026

The short answer

  • A time bar is the deadline after which a cargo claim can no longer be brought, however clear the carrier's fault.
  • Ocean (Hague-Visby Rules): written notice at delivery, or within 3 days if the damage was not apparent; suit within one year of delivery.
  • Air (Montreal Convention): a written complaint within 14 days of receipt for damage, 21 days for delay; without it, no action lies against the carrier. Suit within two years.
  • US road and rail (Carmack): carriers may not set less than nine months to file a claim, or less than two years to sue after a written refusal.
  • The clocks run from delivery, not from the day someone opens the box.
A STORY · NAMES AND NUMBERS INVENTED

The dock receiver signed for twenty-two pallets of tiles on a Thursday afternoon, in the rain, with trucks queuing behind. The receipt said nothing but a name and a time. Six weeks later, a picker in aisle nine pulled a pallet and heard it rattle. Four more pallets rattled the same way.

Quality emailed photographs to the forwarder, who promised to "look into it". Purchasing replaced the tiles from stock. Fourteen months after delivery, a new claims coordinator found the photographs and sent a formal claim. The carrier replied in two lines: time-barred.

The tiles were broken at sea. The claim was broken in the office.

What is the time limit for a cargo claim?

There are usually two clocks. The notice tells the carrier something is wrong while the evidence still exists. The time bar is the last day to start a lawsuit or arbitration. Missing the first weakens a claim; missing the second ends it.

Mode and regimeNoticeTime to sueRuns from
Ocean, Hague-Visby RulesIn writing at delivery; within 3 days if damage not apparentOne year (can be extended by agreement after the event)Delivery, or when the goods should have been delivered
Air, Montreal ConventionIn writing: 14 days for damage, 21 days for delayTwo yearsReceipt (notice); arrival at destination (suit)
US road and rail, CarmackWritten claim: carrier may not set less than 9 monthsNot less than 2 yearsThe carrier's written refusal of the claim (suit)
Forwarder or 3PL termsSet by the contractSet by the contract, often shorterRead the terms on the booking

Summary only. The transport document and route decide which regime applies.

Under Hague-Visby, a late notice does not kill the claim by itself: the clean receipt becomes evidence of good order, and the burden moves to the receiver. Under the Montreal Convention, without a written complaint in time no action lies against the carrier, unless it acted fraudulently. The air clock hurts fastest.

OCEAN (H-V)AIR (MC99)VSnotice: 3 days if hiddensuit: one year from deliverycomplaint: 14 days, in writingsuit: two years from arrivalDifferent clocks. Both want it in writing.
Two modes, two clocks. The deadlines differ by mode; every one counts from delivery and asks for paper, not a phone call.

Where the deadline is really lost

Claims are rarely lost by choice. They are lost between rooms:

The dockThe receipt is signed clean under time pressure. Damage found weeks later must be proved against a paper that says all was well; see proof of delivery.
The inboxNotice goes by email to a contact at the forwarder, not to the carrier named on the transport document, and nobody records the date it was sent.
The handoverPurchasing replaces the goods and the damage feels solved. The claim has no owner and no deadline on any calendar.

Insurance does not always catch the fall: where a missed notice destroyed the insurer's right to recover from the carrier, cover may be reduced, depending on the policy wording. And a claim that survives on time can still be capped by the carrier's liability limit.

Tiles at sea: one year, then goneInvented example · days counted from deliverynoticeone year to sue or agree an extensiontime-barred050100150200250300350400450dayssigned cleandamage foundemail to forwardertime barformal claim sentAn extension agreed in writing before day 365 would have kept the claim alive.
The clock started at the dock. Nothing was hidden; the email on day 45 was simply never turned into a dated, written claim.

The signs already in your files

One late claim can be bad luck. A habit shows when separate records line up:

  • Your receiving log records damage or shortage on one date, or a receipt marked clean with damage logged days later.
  • Your claims register shows claims filed after the deadline for the mode, or a status of "rejected: time-barred".
  • Your transport documents (bill of lading, air waybill, road consignment note) name the mode and the carrier, and so the clock that applied.
  • Your delivery receipts were signed without exceptions on shipments later found damaged.

What it costs, told honestly

Each pool against its own total, never summed. Invented numbers for one year of claims:

PoolTotalOf whichShare
Recovery148,000 claimed on all cargo claims filed78,300 claimed after the deadline for the mode, or rejected as time-barred53%
Goods and stock64,800 landed value of the damaged tiles64,800 recovered from neither carrier nor insurer100%
Damaged deliveries17 deliveries later found damagedreceipt signed with no exception noted11 of 17

The tile loss sits inside the late-claim value in the first line; it is shown again only against the goods it belongs to.

How the world answers

Two courts, two modes: one held a bank to the year, one counted the days and let a claim through.

United Kingdom (cargo: Indonesia to India) One year means one year · 2018–2024

About 85,510 tonnes of steam coal were shipped from Indonesia on the GIANT ACE and discharged at Jaigarh, India, in April 2018. FIMBank, holding the 13 bills of lading, alleged that the coal was released after discharge to parties not entitled to it, and started arbitration against the carrier, KCH Shipping, on 24 April 2020, about two years later.

The bank argued that the Hague-Visby Rules stop at discharge, so a six-year English limitation period should apply. It lost before the tribunal, the High Court and the Court of Appeal. On 13 November 2024 the UK Supreme Court unanimously dismissed the appeal: the one-year time bar covers misdelivery after discharge too. The point of the bar, it said, is finality.

Last effect: the judgment, [2024] UKSC 38, is final; under English law a cargo owner now has one year for misdelivery claims after discharge, as for loss and damage.

France Saved on the last day · 2012–2018

Research material flew from the United States to Sanofi's research centre in Montpellier. On 26 July 2012 the receiver noted that the temperature had gone out of range, and the cargo was useless. The written complaint was handed to the carrier's representative on 9 August 2012.

The carrier argued it was late. On 20 March 2018 the Court of Appeal of Montpellier held that the Convention alone governs the count, but the carrier's own conditions started the 14 days on the day after receipt, which favoured the shipper and is allowed. The deadline ran out at midnight on 9 August: the complaint was in time.

Last effect: the claim survived the time objection. The case record we read reports the ruling on time, not any amount paid.

Questions to ask before you act

  1. On what date was the damage first noticed, and was it written on the delivery receipt?
  2. Was written notice sent to the carrier named on the transport document, and is its date on file?
  3. Which regime applied: the convention for the mode, or the forwarder's own terms?
  4. Did anyone ask the carrier for a time extension in writing before the year ran out?
  5. Did the insurer reduce cover because the carrier claim was lost?

Frequently asked questions

How long do you have to file a cargo claim?

It depends on the mode and the contract. Under the Hague-Visby Rules, suit must be brought within one year of delivery; under the Montreal Convention, a written complaint is due within 14 days for damage and suit within two years; under Carmack in the US, carriers may not set less than nine months to file a claim.

Can the one-year Hague-Visby time bar be extended?

Yes, by agreement between the parties after the cause of action arises. The extension should be in writing and agreed before the year runs out.

Is an email to the forwarder enough notice?

It may not be. Notice should be written, dated and sent to the carrier or its agent; forwarder terms say who must receive it and by when.