The short answer
- Temperature loss in a reefer (refrigerated container) usually has one of three roots: a wrong setpoint or instruction, the wrong equipment for the goods, or a real breakdown of the reefer unit.
- Insurers' data puts the human share high: TT Club found about 30% of temperature claims came from miscommunicated instructions and about 23% from wrong settings, against roughly a quarter from equipment failure.
- Carrier terms usually leave the setpoint to the shipper, and many cargo policies pay for temperature loss only after a named breakdown of the refrigerating machinery.
- A reefer is built to hold cargo at a temperature, not to cool warm cargo. The temperature log and the setpoint on the booking are the main evidence in any claim.
The quality lab printed the logger trace and laid it on the table. A flat line at minus eighteen for twenty days. At the very start, a slope: thirty hours of the box pulling its cargo down from plus four.
The cartons had waited on a warm dock while a truck was found. The reefer had worked perfectly the whole way. The carrier's reply took two lines: unit operated at the requested setpoint throughout.
The insurer's reply took three: no breakdown, no cover.
Wrong setpoint, wrong box, or a real breakdown?
A setpoint is the temperature the reefer unit is told to hold. It is normally written on the booking and the bill of lading, and set from the shipper's instruction. Wrong container type is the cousin of the same problem: goods that need ventilation, an open top, a flat rack or controlled atmosphere, booked into a standard box.
| Root | What the log shows | Where the risk usually sits |
|---|---|---|
| Wrong setpoint or instruction | Steady line at the wrong temperature | With the party that gave the setting |
| Cargo loaded warm, or wrong equipment | Long pull-down at the start, or none needed | Usually on the shipper's side |
| Unit failure, poorly watched | Sudden rise, defrost loops, gaps in the record | Often with the carrier, if it failed to monitor |
Who carries the risk depends on the contract, the bill of lading terms and the governing law. These are tendencies, not rules.
The temperature log is the whole case
Claims data shows how much rides on this. The Swedish Club reported in 2022 that reefer claims made up 30% of its container claims over five years. A weight error like a wrong VGM costs fees; a temperature error can cost the whole lot.
The signs already in your files
One warm carton is a handling slip. A pattern shows when separate reports point at the same lots:
- Your item master flags a temperature range or special handling, and the booking for the same items shows a dry box or a different setpoint.
- Your receiving log shows quality holds or rejections for temperature or condition on those lots.
- Your claims register records temperature excursions on the same lanes, again and again.
- Your booking records show setpoints typed in by hand, in mixed units.
What it costs, told honestly
Three pools, each against its own total, never summed. Invented numbers for one season on one chilled lane:
| Pool | Total | Of which | Share |
|---|---|---|---|
| Goods & stock | 186,000 received in temperature-controlled lots | 71,000 rejected or blocked at quality control | 38% |
| Recovery | 71,000 rejected value | 64,500 not recovered from carrier or insurer | 91% |
| Customers (count) | 90 open orders for the items | 26 could not be filled | 26 of 90 |
The recovery line is where the evidence shows. A logger, a correct setpoint and a timely notice move money from the second column back to the first.
How the world answers
Two courts, two cargoes of frozen food, opposite results. The difference was who made the mistake and what the record showed.
Japan A court reads the back of the bill · 2017
Frozen meat left Oakland for Tokyo in October 2017 in three 40-foot reefers. The bill of lading said zero degrees Fahrenheit, about minus 18 Celsius; the unit was set to zero Celsius, apparently a mix-up of units. The carrier found the error the day after loading and corrected it the next day. The consignee refused the affected container, the carrier stored it, and in July 2018 the meat was incinerated on the direction of Japan's animal quarantine agency.
The Tokyo District Court dismissed the consignee's claim of about US$63,897. It read the bill's standard terms as putting the setting, and its risk, on the merchant, and the wrong setting happened before loading.
Last effect: the court upheld the carrier's counterclaim of JPY 16,145,939 for storage and disposal, as reported by the UK P&I Club in 2021.
Australia A machine nobody watched · 2005–2010
About 8,300 kg of frozen seafood sailed from Yokohama to Melbourne in November 2005. The container's controller kept getting stuck in defrost, once for more than 77 hours, a fault the court linked to incompatible software. The ship's reefer log was sparse and did not appear to reflect real checks.
The Federal Court of Australia found the carrier had failed to care for the goods properly. It refused the latent defect defence, because proper monitoring would have caught the fault.
Last effect: judgment on 5 July 2010 awarded the cargo owner A$130,192.40, with interest and costs to follow.
Questions to ask before you act
- Which setpoint and equipment were booked, and does that match the range on the item master?
- Was a logger tied to this lot, and who holds its data?
- Was the cargo at temperature when it went into the box?
- Does the cargo policy cover temperature loss only after a breakdown of the machinery?
- Has notice of claim been given within the period the contract allows?
Frequently asked questions
Who is liable if a reefer container is set to the wrong temperature?
Usually the party that gave or applied the wrong setting. Many bills of lading leave the setpoint to the shipper; courts look at the contract terms and when the error happened.
Does cargo insurance cover reefer temperature damage?
It depends on the wording. Many policies cover temperature loss only after a breakdown of the refrigerating machinery, not after a wrong setting or warm loading.
Can a reefer container cool down warm cargo?
Not reliably. Reefers are designed to hold cargo at a temperature, so goods should be pre-cooled before loading.
What evidence do you need for a reefer cargo claim?
The booked setpoint, the bill of lading, the reefer unit's download, an independent logger record tied to the lot, and a notice of claim given in time.
Read next
Sources
- UK P&I Club: Tokyo District Court judgment on reefer setting
- Federal Court of Australia: Seafood Imports v ANL Singapore [2010] FCA 702
- StrategicRISK: TT Club on temperature-controlled cargo losses
- The Swedish Club: refrigerated cargo analysis, Oct 2022
Sources opened and checked Nov 2026.