The short answer
- VGM (Verified Gross Mass) is the total weight of a packed container: the cargo, all packing and securing material, and the empty container itself, obtained by an approved method.
- It is required by SOLAS regulation VI/2, as amended by the International Maritime Organization, in force since 1 July 2016.
- The shipper named on the bill of lading or sea waybill is responsible for providing it to the carrier and terminal in time for stowage planning.
- Method 1 weighs the packed, sealed container. Method 2 weighs every item packed and adds the container's tare weight, using a procedure approved by the country where packing took place.
- Without a VGM, a packed container should not be loaded. Tolerances and penalties are set by each country, not by SOLAS.
What is VGM?
VGM is the verified gross mass of a packed container. Gross means everything: goods, cartons, pallets, dunnage (the timber or bags that fill gaps), lashings and the tare of the container, which is its empty weight as marked on the door. Verified means it was obtained by one of two methods the rule allows, not estimated or copied from an invoice.
The rule sits in SOLAS, the International Convention for the Safety of Life at Sea. The IMO's Maritime Safety Committee adopted the amendment in November 2014, and it entered into force on 1 July 2016. The reason is safety: a ship's stowage plan, its stability and the stacks of boxes on deck all depend on knowing what each container really weighs.
Method 1 vs Method 2
Method 1 weighs the whole packed and sealed container, on weighing equipment such as a weighbridge, after the box is closed. Method 2 adds up the weight of every package and cargo item, including pallets, dunnage and securing material, and adds the container's tare. SOLAS requires Method 2 to follow a certified procedure approved by the competent authority of the country where the packing was completed.
Each country sets the details. Hong Kong's Marine Department, for example, requires Method 1 weighing on equipment it approves, a free registration for Method 2 shippers, and records kept for one year. It also publishes a tolerance for the declared VGM: plus or minus 0.5 tonnes for containers up to 10 tonnes and 5% above that. Other administrations set different tolerances, so the figure belongs to the country of loading.
Who is responsible for the VGM?
Under SOLAS, the shipper is responsible: the party named as shipper on the bill of lading or sea waybill, or the party that contracted the carriage with the carrier. A forwarder or packer may weigh the box or send the data, but the declaration is the shipper's. The carrier and terminal use it; they are not the ones who verify it, though they may check-weigh.
| Party | Role in VGM |
|---|---|
| Shipper | Obtains the VGM by Method 1 or 2 and declares it, signed, in time |
| Packer or forwarder | Often weighs or compiles the data for the shipper |
| Carrier | Receives the VGM, sets a cut-off, uses it for stowage |
| Terminal | Receives the VGM; may weigh boxes at the gate |
| Ship's master | Keeps final discretion to refuse a container |
The packed weight must also stay within the maximum gross mass on the container's safety approval plate, a separate limit from the VGM.
A worked example
Invented numbers. An exporter packs a 40-foot container with 18 pallets of machine parts. The commercial invoice shows a net cargo weight of 16,200 kg. The pallets weigh 25 kg each (450 kg), the dunnage and lashings 180 kg, and the container's tare on the door is 3,750 kg.
Method 2: VGM = 16,200 + 450 + 180 + 3,750 = 20,580 kg. A clerk who sends only the invoice weight, 16,200 kg, under-declares the box by 4,380 kg, about 21%. If the box is check-weighed at a terminal using a 5% tolerance, it fails. If it is not checked, the planners stow a box over four tonnes heavier than they think.
Common VGM mistakes
Questions to ask before you act
- Which method do we use, and is our Method 2 procedure approved where we pack?
- Does our VGM include pallets, dunnage, lashings and the container tare?
- Who signs the declaration, and does it reach the carrier before the VGM cut-off?
- What tolerance does the country of loading apply on a check weighing?
Frequently asked questions
What is VGM in shipping?
VGM is the verified gross mass of a packed container: cargo, packing, securing material and the container's tare, obtained by an approved method and declared by the shipper before loading.
When did the VGM requirement start?
The SOLAS amendment requiring a verified gross mass for packed containers entered into force on 1 July 2016.
Who is responsible for providing the VGM?
The shipper named on the bill of lading or sea waybill, or the party that contracted the carriage. Others may weigh on its behalf, but the declaration is the shipper's.
What is the difference between VGM Method 1 and Method 2?
Method 1 weighs the packed, sealed container. Method 2 adds the weight of all packed items and materials to the container's tare, using a procedure approved by the national authority.
What is the VGM tolerance?
SOLAS does not set one. Each country decides; Hong Kong, for example, allows 0.5 tonnes up to 10 tonnes and 5% above.
Read next
Sources
- IMO: Verification of the gross mass of a packed container
- Hong Kong Marine Department: VGM requirements
Sources opened and checked Nov 2026.
The list sees it first
One Logbook entry a week, one wave at a time. Nothing you upload is ever kept.
Thanks. You are on the list.